Here are the questions that come up in almost every first call. Below them are four guides on steering initiatives.

Getting started

Do we need a new project tool?
No. ValueSpoc builds on your tools. Your teams keep working as before, and ValueSpoc picks up the status there.
How long does the rollout take?
You work with it from day one. The structure from vision to task is in place. How long the rollout takes depends on its scope and is stated in the quote.
Can we bring existing data across?
Yes. You import existing project lists, tasks and structures. Jira Cloud, ServiceNow and Microsoft Dataverse are integrated. In Enterprise a REST interface with OpenAPI comes on top.
Who maintains the data?
The people already working on the initiatives. Progress, budget and reports come out of their work. Whoever owns a benefit enters its values.
How much extra work does it take?
The work moves into the daily routine. Status reports, committee papers and overviews of all initiatives come from there. Gathering figures from spreadsheets falls away.
When can we show the first result?
As soon as a benefit has a plan, a measure and a first actual value. The structure is there from day one, and the evidence grows with every measurement.

Daily work

How do we find things again?
With the search in the app. It finds projects, tasks, milestones, risks, decisions, people and tenders in seconds.
Can we choose which alerts we receive?
Yes. Your administrators switch each type of alert on or off. Only what matters to you comes through.
Which languages does ValueSpoc support?
German and English throughout, including the help centre. International teams work in the same system.

Data and AI

Where is our data?
The application and the language models run at IONOS in Germany by default. We enable further models for your organisation on request.
What does Spoc do with our data?
Spoc, the AI in ValueSpoc, makes proposals. A person reviews and approves them. Before anything goes to a language model, the names of recorded people are replaced.
What will the works council say?
The pulse survey is anonymous. Utilisation per person is a separate module. For the talk with the works council we provide the functional description, the data processing agreement and the technical and organisational measures.

Contract

Is there a minimum term?
Not on the monthly plan, which can be cancelled monthly. The yearly plan runs twelve months. After that it renews only if you want it to.
How do we get at our data?
You export lists and reports at any time as Excel, CSV, PDF or PowerPoint. In Enterprise, the export of core objects over the REST interface and operation in your own data centre come on top.

Guides

What works when steering initiatives.

A baseline that holds up later

Why the before value comes first

At the end of an initiative the question is what it achieved. The answer needs a comparison value from before, and that only exists at the start. What is added later from memory can hardly be evidenced.

Record a benefit as a change

Record a benefit as a difference. Four hours less effort per report is a benefit, six hours per report only describes the state. The difference matters as soon as several benefits are combined. Changes can be added up and say something about the effect.

Keep the difference apart from absolute levels

For the difference you need a baseline and later measurements that refer to it. Also note the absolute level before and the target, so a reader can judge the scale. These figures are for readability and belong in no sum.

Set your share in advance

A change usually has several causes. Decide before the start which share you attribute to this initiative, and justify it in one sentence. A share set only at the end is hard to justify.

The measurement rule before the first measurement

Write down who measures, where the figure comes from and at what cadence. If the method changes, the change mostly shows the new method. A monthly cadence suits many steering measures, short enough to react and with manageable effort.

In ValueSpoc

In ValueSpoc a benefit is recorded as a change against its baseline. The level before and the target level sit beside it and enter no sum. Attribution share with its reason, measurement cadence and next measurement due are fields of the benefit, and the source is recorded with each measurement.

Ask us directly.